Our Home
Yard Pictures
Work Shop
New Floors
Game Room
New Copula
Hail Storm 04.09
Flood  Sept. 2009
Scott Room
Our Office
New Roof 2009
Why Midnight Eagle ?
Snow Storm 02.2010
 
 

I was not planning on doing this so soon. But someone asked for pictures.


So this is the rooms and the better looking part as it is after we cleaned up most of the mess and water. We had about 15-20 inches of rain. Our problem was the foundation drains were not draining the water fast enough and after inspection were actually blocked.


We had so much rain that we could barely keep ahead of it in the office and server closet with the carpet vac and dry vac. It was horrible to stay ahead of it for about 3 hours.  We had to rip all the carpet padding out and then bought about 8 fans to dry the carpet and cement. We had to have the carpet pulled back to dry the cement and then dried the carpet.  It took about 6 days to get back to somewhat normal after the flooding.


I will be taking more and adding to it. Funny thing is the house is cleaner and you can't even tell where I fixed the foundation pipe drainage.